As part of this task ALT provides technical
design, engineering and systems integration
support. This includes acquisition support
and technical consulting to manage inside/outside
cable plant survey and design, development
of the bill of materials (BOM), equipment
upgrades, and recommendations for new equipment
and infrastructure, and redeploying existing
equipment within the new design.
ALT has also provided Quality Assurance
services at Ft. Belvoir, and Ft. Myer.
Acquisition Support
ALT provides CECOM Program Management with
acquisition support services including Statement
of Requirements, Requirements Analysis,
Engineering Design Packages (EDPs) and Statement
of Instructions. Additionally, ALT serves
as a technical contact for contract officers,
program managers, and vendors.
ALT has assisted in a turn-key acquisition
support process. This includes coordinating
and conducting pre-bid walk-throughs with
vendors, responding to technical questions
from the Statement of Requirements or EDPs,
coordinating vendor proposal reviews, assisting
and participating in the source selection
committees, contract awards, as well as
coordinate Kick off Meetings between the
vendor, government (PM) and the client (base).
ALT’s final responsibility in this
process is to conduct VSS (verification
site surveys) walk-throughs with the vendor
to verify any changes that need to be incorporated
into the EDPs.